Section outline

  • Topic Title: Calculation

    Target Pupils: 35-40

    Duration: 60 Minutes X 2 session

    Topic objectives:

    ·         The gather the ability to calculate the production of carding machine, draw frame machine and blow room machine.

    ·         To learn how to calculate the cleaning efficiency of blow room and carding machine.

    ·         To know the different parameters of blow room machines, carding machine and darw frame machine.

    Content

    Methods/ Techniques

    Resources / Aid

    Time required

    Welcome speech, Introducing the topic, ice breaking, Attendance, Pre-assessment

    Lecture, Q & A

    White board/ Projector

    10 Minute X 2 session

    Development:

    a)      Describe different formulas of calculation including production, cleaning efficiency and so on.

    b)      Calculation techniques of the required calculation.

    c)      Conversion of different units 

    Lecture

     

     

    Group Study

      

    Discussion

    White board

     

     

    MMP

     

    Related videos

    40 Minutes X 2 session

    Conclusion:

    Summing up the main points, Feedback and answer, Assessment of LOs, Forward plan

    Discussion

    Q& A

    Quiz

    White board


    MMP

    10 Minutes X 2 session