Production Calculation

Problem 3: Delivery roller speed anddelivery roller diameter is 200 rpm and  35mm respectively, feed roller speed and feed roller diameter 5 rpm and 70 mm respectively. Find out the production of draw frame is in kg/hour. Where, carded sliver is 50 gm/yard and machine efficiency is 80%. Calculate the mechanical draft too.

Problem 4: If the carded sliver is 55gm/m and drawn sliver weight is 45gm/m, what will be the required DCP of draw frame? When draft constant is 340.

Attach your solutions of problem in one pdf file

(There are no discussion topics yet in this forum)